What should be agreed before a motion graphics project moves into animation?

Agree the script, storyboard, visual style, timing, sound and delivery formats before animation, with clear approval owners and review stages.

Written by Remon Geyser

Agree the message, script, scene sequence, visual style, and delivery requirements before detailed animation. Everyone should understand what the video will say and how it will look before reviewing polished movement.

The approval package should make these decisions visible:

  • Purpose: the audience, central point, and intended next step

  • Words: approved script, on-screen text, product facts, and any required qualifications

  • Sequence: a storyboard showing the main scenes and how they explain the idea

  • Look: representative style frames covering typography, color, illustration, and brand treatment

  • Timing and sound: target length, pacing, narration approach, music direction, and any licensing responsibilities

  • Outputs: placements, aspect ratios, versions, captions, and other agreed accessibility needs

Adobe’s storyboarding guidance explains how boards make scenes, audio needs, and feedback visible. Where timing is central, discuss whether a rough timed sequence, often called an animatic, would make approval clearer.

Separate approval of the story from approval of the finished animation. A style frame shows the look; it doesn’t establish every transition or movement. Name the decision-maker for each approval and consolidate conflicting feedback before work progresses.

Designity is a premium, AI-enabled and human-led Creative-as-a-Service platform. Its video and motion capabilities can support scripts, storyboards, and animation. A dedicated Creative Director leads direction, specialist selection, and quality; a Creative Project Manager coordinates approvals, priorities, and delivery. Agree the specific review stages and deliverables for your project rather than assuming every production uses an identical sequence.

If the message or scene order changes later, revisit the affected scope and schedule. Plan capacity and dependencies still apply when revisions require substantial reworking.