Skip to main content

How should we compare graphic-design and video subscriptions when they measure capacity differently?

Compare shared team hours, production queues and project budgets against the same mix of graphic design and video work.

Written by Remon Geyser

Compare the work each subscription can schedule and finish, not just the unit it sells. A team-hour allowance, a daily production queue, and a project budget describe different constraints. None translates into a reliable number of finished graphics or videos without a scoped workload.

Start with one representative month: the original graphics, video lengths, adaptations, and revisions you need, plus the source material already available. Separate editing supplied footage from creating an animation or arranging a shoot. Include the launch dates and any assets that must be developed together.

The published models illustrate what needs translating:

  • Shared team hours: Designity’s Plus plan currently lists 120 dedicated hours per month and two active creatives/projects simultaneously. Its hours are distributed across the team. Ask for the combined graphics-and-video schedule, including how leadership, production, and revisions use the allowance.

  • Daily production queue: ManyPixels’ Advanced plan describes one daily output, with one project worked on at a time; smaller tasks or revisions can share that output. A daily output is not a promise to finish a complex video each day. Confirm that the proposed plan covers your exact video work and how it shares the queue with graphics.

  • Project budget: Superside’s Flex plan describes a team configured around the workload and unused budget rolling over for up to three months. Its subscriptions carry an annual commitment. Request estimates for the same assets, the budget available for production, and the rules governing any rollover or additional spend.

These are examples of capacity models, not equivalent service packages or a provider ranking. Check the current Designity plan details, ManyPixels pricing, and Superside pricing before choosing.

For each proposal, record three results: what can finish in the month, which tasks can run at the same time, and what happens when feedback or a priority change uses the remaining capacity. Keep creative direction, specialist availability, and your own briefing time visible alongside the fee. A large allowance is less useful if the specialist or approval your launch needs is unavailable.

Designity is a premium, AI-enabled and human-led Creative-as-a-Service platform. Its dedicated Creative Director is relevant when the static and moving assets need one coherent creative approach. Compare that managed leadership and the proposed production sequence with your actual needs, rather than assuming shared hours are directly interchangeable with another provider’s output or budget units.

Did this answer your question?