Start with the exact product fact or feature that changed, then trace where it appears and what depends on it. Assess the affected work before approving a new delivery date. A short wording change may be local, while a changed workflow can affect the script, recording, animation, and every derived version.
Ask the product owner to supply the approved replacement information, its effective date, and which audiences or product versions it applies to. Keep unknown details visible. Creative teams should not have to infer the new behavior from a comment such as “the feature has changed.”
Review the current assets and sort the work into three groups:
Still usable: approved material that remains accurate, such as unaffected scenes, brand elements, or layouts.
Local correction: a change that can be made without altering the asset’s overall message or sequence, subject to review.
Dependent rework: changes that force other work to move, such as a new demonstration requiring a revised script, recording, and edit.
For each affected asset, record the current version, the correction needed, who supplies the new input, which specialist must change it, and what needs approval again. Include captions, on-screen text, alternate sizes, cutdowns, and any already-scheduled materials that use the old information.
If a product step moves to a different screen, replacing a screenshot in a sales deck may be straightforward. The matching demo could need a new recording, revised narration, and retimed captions. Estimate those as linked tasks rather than treating every affected file as the same edit.
Designity is a premium, AI-enabled and human-led Creative-as-a-Service platform. For scoped cross-format work, its dedicated Creative Director can assess how the changed information affects the story and creative quality. The Creative Project Manager coordinates the revised inputs, sequence, and reviews. Your product owner confirms the facts; your marketing owner decides what the launch must retain. The extent of rework and available capacity determine the revised plan, not the number of comments submitted.
Before resuming affected production, agree what can be reused, what must be rebuilt, any scope or cost change, and the new approval points. Have the responsible channel owner hold or replace inaccurate scheduled assets. Keep unaffected work moving where its inputs are settled.
For the earlier production decisions that reduce avoidable rework, see what to agree before animation begins.